Pavement Marking Material

Estimate paint and glass beads for long lines, legends, and symbols.

View estimate

Long lines

Add a row for each material, width, or road segment.

Enter actual painted footage for each row, excluding gaps. Zero or blank footage contributes no material. Remove unused rows or leave them blank for a special-markings-only estimate.

Special markings Optional

Enter the number of each legend or symbol. Open its size control for path markings or a project-specific area.

Rate basis & project rates

Legends23 types
Marking Qty sq ft / each
AHEAD 28.86
BIKE 22.15
BUS 18.55
CANADA 32.87
EAST 21.71
EXIT 17.76
LANE 22.30
LEFT 19.11
MERGE 33.28
NO 12.92
NORTH 29.53
ONLY 20.90
PED 17.63
RIGHT 25.10
SCHOOL 32.58
SOUTH 27.83
STOP 21.50
TO 10.43
TRAIL 22.10
TURN 23.04
WEST 24.42
XING 20.13
YIELD 22.91
Symbols22 types
Marking Qty sq ft / each
ACCESSIBLE 11.11
BICYCLE (ROAD) 10.54
BICYCLE (LANE/PATH) 5.93
BIKE TURN ARROW, LT OR RT 4.11
DEDICATED LANE (HOV) 10.24
DIRECT ARROW (BIKE) 5.07
LEFT, RIGHT ARROW 28.99
LT ROUNDABOUT ARROW 17.48
LT, RT, THRU ARROW 40.26
MERGE ARROW 42.17
RAILROAD 60.89
RAILROAD-ALTERNATE 59.06
RT. LT ROUNDABOUT ARROW 22.19
RT, THRU, LT ROUNDABOUT ARROW 28.31
SHARROW 9.26
THRU ARROW 13.16
THRU, LT ROUNDABOUT ARROW 23.60
THRU, LT TURN ARROW 28.14
THRU, RT TURN ARROW 28.14
TURN ARROW, LT OR RT 16.42
WRONG WAY ARROW 34.56
YIELD TRIANGLE 3.00

No special markings entered.

Material areas: MDOT PAVE-900-H, sheet 9.